UK industrial & logistics: demand is broadening, but the buildings it needs are harder to deliver
The UK industrial and logistics market has recovered. Take-up reached around 21m sq ft in H1 2026, well ahead of the pre-pandemic H1 average of 17m sq ft. More types of occupier are taking space than ever before.
The challenge is no longer finding demand. It is delivering buildings that meet it. Occupiers expect more from their space, power and planning are slowing new supply, and investors are waiting for clearer conditions before committing.
Here is what is driving the market, what is holding it back, and what landlords should be doing now.
A wider occupier base
Third-party logistics operators (3PLs) remain the backbone of demand. They took around 10.6m sq ft in the 12 months to Q2 2026, against a pre-pandemic annual average of 6.3m sq ft. Four other sectors are now reshaping the market.
Defence. This is the standout. Defence-related take-up reached around 3.9m sq ft in 2025, the highest on record. The UK is attracting more new defence production investment than any other European country, and Savills expects the sector to add around 3m sq ft a year to UK logistics demand.
Manufacturing. Growth is being driven in part by Chinese businesses. The UK took 30% of all European leasing by Chinese firms between 2024 and H1 2026. UK take-up by Chinese companies is forecast to exceed 4m sq ft this year.
E-commerce. Online now makes up around 27% of retail sales. Parcel volumes are forecast to be 38% above their Covid peak by 2030, which will keep last-mile and urban demand strong.
Urban and multi-let. Take-up of units between 5,000 and 99,999 sq ft reached around 3.1m sq ft in H1 2026, up from 2.4m a year earlier. Manufacturers (24%) and logistics and parcel operators (22%) led the way.
Specification is the new baseline
Occupiers now treat eaves height, loading doors, floor loading and services as standard. Buildings that fall short are being marked down to Grade B or C.
Grade A availability fell in Q2 2026. UK rents are forecast to rise by around 4% this year, before easing to 2–3% a year through to 2030.
Automation is adding to the pressure. Between 20% and 30% of warehouses are now automated, up from 3–5% in 2006. With storage and picking making up around 63% of warehouse costs, the case for automation is strong. But automated systems need more height, flatter floors, better sprinklers and more power.
Power, planning and a patient investment market
Power. The GB demand connections queue tripled from 41GW to 125GW between November 2024 and June 2025, largely because of speculative data centre applications. National peak demand is just 45GW. Ofgem’s connections reform is due for consultation this autumn, but is unlikely to make a difference before 2027. UK industrial electricity is also the most expensive of 12 European locations benchmarked by Cushman & Wakefield.
“Power is becoming increasingly complex and variable; the only certainty is needing more of it.” – I&L development manager, quoted by esmart networks, Sheds UK 2026
Planning. The planning system continues to frustrate developers on both outcomes and timescales. That is restricting new high-specification stock just as occupiers are asking for it.
Investment. UK industrial and logistics investment fell to a record low of around £2.2bn in H1 2026, against a pre-pandemic H1 average of £3.9bn. Investors are still keen, and industrial has attracted more capital raised for European real estate than any other sector this year. Pricing and confidence are what is holding back deployment.
What to expect
Over the next 12 to 18 months, we expect:
- Take-up to stay above pre-pandemic levels, led by 3PLs, manufacturers and defence occupiers
- Grade A availability to tighten further as more stock is reclassified as Grade B or C
- Investment to stay subdued until macroeconomic uncertainty clears
- Power and planning constraints to continue
Looking further ahead to 2030, last-mile and urban demand should keep growing with e-commerce, and wider automation will raise the bar on height, floor and power specification. Government policy, particularly the Minimum Energy Efficiency Standards (MEES), will increasingly shape asset management strategy. Geopolitical tension is a risk to energy and fuel costs, though sustained defence demand should help offset it.
What this means for landlords
The gap between Grade A and everything else is widening. Two steps will help protect income and value.
Position assets for the market. Smart, energy-efficient buildings are now the norm. Landlords should be ready to act before lease events, not after them.
Align capex with regulation. Plan refurbishment spend around upcoming MEES requirements. Doing the work once, to the right standard, protects income and avoids repeat interventions.
How PBC can help
Our Building Consultancy team supports owners and landlords from acquisition through to refurbishment and lease end:
- Future-proofing advice on fabric and M&E improvements, from technical due diligence to planned maintenance
- Procurement and delivery of refurbishment works through trusted supply chains, with full contract administration
- Lease and compliance support, including dilapidations, licences for alterations and schedules of condition
To discuss how these trends affect your portfolio, contact James Cannon, Senior Chartered Surveyor, at jcannon@pandbc.co.uk, or Jack Dison, Director, at jdison@pandbc.co.uk.
[Download the full October 2026 market update]
Author: James Cannon MRICS , Senior Chartered Surveyor at PBC.